Road Maintenance
Summer Road Works Programme 2026/2027
Maintenance Schedule
Resealing
| Roads | Ward |
|---|---|
| Buchanan St (Paeroa) | Paeroa |
| Bush St (Paeroa) | Paeroa |
| Fisher Rd (Netherton) | Paeroa |
| Goldfields Rd North | Paeroa |
| Goldfields Rd South | Paeroa |
| Old Reservoir Rd | Paeroa |
| Pūkahu Rd | Paeroa |
| Rangiora Rd (Komata) | Paeroa |
| Taylor Ave | Paeroa |
| Taylor Ave | Paeroa |
| Wires Rd | Paeroa |
| Awaiti Canal Rd | Plains |
| Awaiti Canal Rd | Plains |
| Awaiti Rd | Plains |
| Back Miranda Rd | Plains |
| Bush Rd (Plains) | Plains |
| East Coast Rd | Plains |
| Hamilton Rd | Plains |
| Hauraki Rd | Plains |
| Hauraki Rd | Plains |
| Hauraki Rd | Plains |
| Hauraki Rd | Plains |
| Hopai Rd East | Plains |
| Hopai Rd West | Plains |
| Kaiaua Rd | Plains |
| Kaihere Rd | Plains |
| Maratoto Rd | Plains |
| Maratoto Rd | Plains |
| Mead Rd | Plains |
| Old Barn Rd | Plains |
| Paul Dr | Plains |
| Rata Rd | Plains |
| Rawerawe Rd West | Plains |
| River Rd (Ngātea) | Plains |
| River Rd (Ngātea) | Plains |
| Spring Rd | Plains |
| Stembridge Rd | Plains |
| Torehape Rd East | Plains |
| Amaranth St | Waihī |
| Baker St | Waihī |
| Farrelly Rd | Waihī |
| Ford Rd | Waihī |
| Galbraith St | Waihī |
| Galbraith St | Waihī |
| Galbraith St | Waihī |
| Galbraith St | Waihī |
| Golden Valley Rd | Waihī |
| Haszard St | Waihī |
| Mackay St (Waihī) | Waihī |
| Mackay St (Waihī) | Waihī |
| Martha St | Waihī |
| Mataura Rd | Waihī |
| Mataura Rd | Waihī |
| Ngātitangata Rd | Waihī |
| Victoria St (Waikino) | Waihī |
| Victoria St (Waikino) | Waihī |
| Wellington St | Waihī |
| Woodlands Rd | Waihī |
| Woodlands Rd | Waihī |
Asphalt
| Roads | Ward |
|---|---|
| Opatito Rd | Paeroa |
| Hughenden St | Paeroa |
| Waitāwheta Rd | Waihī |
| Waitāwheta Rd | Waihī |
Road Rebuild
| Roads | Ward |
|---|---|
| Hauraki Rd | Plains |
| Kaihere Rd | Plains |
| Barry Rd | Waihī |
| Golden Valley Rd | Waihī |
Road Resealing and what to expect
Our resealing programme takes care of defects in the existing road surface and reduces the rate of further deterioration, making sure our roads remain safe and able to cope with the amount of traffic using them.
Road resealing is carried out every summer as part of a planned road maintenance programme. Priority is given to roads with surface cracking, potholes and other issues which could pose a risk to road users.
Summer is a busy time
Summer is a busy construction season on the roads for both local councils and Waka Kotahi NZ Transport Agency, who maintain the state highways. Please take extra care around road workers and work sites and stick to the posted temporary speed limits to allow seals to settle well. Reducing speed also helps reduce the movement of loose chips while they embed into the new seal.
Our contractors plan to do most of the work in November and December, weather dependent.
What to expect when your road is being resealed
What's Being Done | Chip sealing. |
Working Hours | During the period from sunrise to sunset. |
Weather | In the event of bad weather or other unforeseen circumstances, work will be postponed until the next suitable day. |
Parking | Please make sure your vehicle is not parked on the street on the day. If it gets in the way, it might have to be towed. |
What To Expect | On the day of resealing there will be trucks, rollers, tankers and workers using other equipment. Warning signs will be put in place for loose stones and reduced speed. Expect short delays of around 10 mins (sometimes up to 20 minutes) while work is being undertaken. |
Safety | Please warn your children of the dangers posed by road works. Ensure that they stand well back from the action and that they follow the directions of the workers. It is also a good idea to keep pets indoors while work is in progress. |
Noise & Dirt | Roadwork is a noisy, dirty business – but please bear with us. We will be doing all we can to minimize the impact on your household and business. Your co-operation and patience will help us get the work done as quickly as possible. |
What Can You Do | Please be careful not to walk on new seal as it can get stuck on your shoes and walk onto your carpets. Bitumen can be removed from soles of shoes using kerosene, turpentine, or citric based cleaners such as a product called De Solve It. If possible, please avoid using your driveway for 48 hours after resealing to reduce the risk of staining. |
Easy Does It | Bitumen, concrete and other road repair materials require a bit of “Tender Loving Care” after they are applied. Please treat all new surfaces with extra care for the two weeks following the completion of the work. Avoid excessive speed, sharp turns and heavy braking. |
We'll Be Back | All new road works are routinely monitored, and, in some cases, workers may need to return to the site to do things like sweeping and repainting road markings. This typically happens within one week of sealing. |