HDC sets targeted rates for water supply based on, the volume of water supplied and, the number of connections to the supply on all rating units connected to a water supply, for the purpose of funding the water supply activity. The water volume rate is on a differential basis based on location, and the extent of the provision of service. Water supply rates are billed separately twice yearly on varying dates in the various water supply areas.
Water use over 10,000kl billed bi-monthly
Those rating units where water use is more than 10,000kl over the last two billing periods, will be billed bi-monthly.
View the list of rating units (with water usage over 10,000kl) by assessment number.
Water meter reading areas
Instalment dates are staggered throughout the year, based on when certain areas in the District have their readings completed. View the maps of the various reading areas: