The District Wide Water Supply Pipe Renewal will upgrade and replace the aging water infrastructure at eight sites throughout the district. The project scheduled to run over the next two years (2024/25).
Sites scheduled for work are:
- Coronation St, Paeroa
- Thames Rd, Paeroa
- Rakino Drive, Kerepēhi
- SH25, Pipiroa
- Canal St East, Ngātea
- Opua Rd, Turua
- Wood St, Paeroa
- Hauraki Rd, Paeroa