Water Services Information Disclosure
Water Charges
Hauraki District Council supplies water to residential and agricultural suppliers and their water consumption charges reflects the split between the two by having a step-based charge which is district wide.
Information on current water related charges, connection fees, development contributions and other applicable charges are listed on Councils fees and charges page and listed below:
- A water Connection is a fixed charge which is charged per meter connected to the property. The annual water connection charge per metered connection for the 2026/27 financial year is $267.70
- Water Consumption is charged on a user pays basis; the customer pays for the amount of water used. It is a stepped charge for each cubic metre of water used and the rates for the 2026/27 financial year are:
Step One – Consumption up to 200 cubic metres $4.70 including GST
Step Two – Consumption 200 – 400 cubic metres $3.38 including GST
Step Three – All consumption over 400 cubic metres $2.88 including GST
Wastewater Charges
Wastewater is rated to cover the cost to process all wastewater. All property within 30 metres of a wastewater main belonging to a council wastewater scheme are charged.
- Connected rating units annual charge per wastewater pan $1,130.66 including GST
- Unconnected rating units annual charge per rating unit $565.33 including GST